No. | Summary | Specialist Consultant | Fee | Status | ||||||||
1 | Permission Expires on 06 Feb 28 | CBC - Complete Building Control | TBA | Notice to be served to council | ||||||||
2 |
The development hereby approved shall be carried out in accordance with the following documents and drawings:
|
|||||||||||
3 | Sustainability measures are to be satisfied with the energy statement before the first use of any dwelling | (NRG Consulting, November 2023) | N/A | . | ||||||||
4 |
No development beyond the construction of foundations shall take place until details and samples of all the external finishing materials (including details of replacement windows to the existing building) to be used on the development hereby permitted have been submitted to and approved in writing by the Local Planning |
KJA / Main Contractor. |
||||||||||
5 |
No flat hereby approved shall be occupied until the exterior of the building has been cleaned, fully in accordance with a scheme of cleaning that shall first have been submitted to and approved in writing by the Local Planning Authority |
KJA / Main Contractor. |
TBA | |||||||||
6 |
To assess and mitigate the impacts of development on significant archaeological remains:
|
Canterbury Archaeological Trust |
£4781.75 + VAT | Archaeology – Field Evaluation Works. | ||||||||
7 |
Within six months of the completion of archaeological works, a Post-Excavation Assessment Report shall be submitted to and approved in writing by the local planning authority. The Post-Excavation Assessment Report shall be in accordance with Kent County Council's requirements and include:
|
. Canterbury Archaeological Trust |
£4781.75 + VAT | Archaeology – Post Excavation Assessment Report | ||||||||
8 |
Prior to the first occupation of any unit hereby permitted, details of a scheme for the enhancement of biodiversity on the site shall have been submitted to and approved in |
Open Spaces |
£1275.00 + VAT | Ecology – Biodiversity. | ||||||||
9 |
Development shall not begin in any phase until a detailed sustainable surface water drainage scheme for the site has been submitted to (and approved in writing by the local planning authority. The detailed drainage scheme shall be based upon the SuDS Report ref: C3238-R1-REV-A and shall demonstrate that the surface water generated by this development (for all rainfall durations and intensities up to and including the climate change adjusted critical 100 year storm) can be accommodated and disposed of at a rate of 0.5l/s without increase to flood risk on or off-site. The drainage scheme shall also demonstrate (with reference to published guidance:
|
Nimbus Engineering. |
£4090.00 + VAT | Drainage Scheme – SUDS. | ||||||||
10 |
No unit hereby permitted shall be occupied until a Verification Report, pertaining to the surface water drainage system, and prepared by a suitably competent person, has been submitted to and approved by the Local Planning Authority.
|
Nimbus Engineering. |
£4090.00 + VAT | Drainage – SUDS Verification Report. | ||||||||
11 |
No dwelling shall be occupied until a post completion noise survey has been undertaken by a suitably qualified acoustic consultant, and a report submitted to and approved in writing by the Local Planning Authority
|
DAA Group. |
£850.00 + VAT | Amenity – Post Completion Noise Survey. | ||||||||
12 |
No external lighting shall be installed until a detailed scheme of lighting has been submitted to, and approved in writing by the Local Planning Authority.
|
KJA |
External Lighting Scheme. | |||||||||
13 | The bin storage facilities, as shown on drawing 2666/10 rev. C, shall be installed and provided in full prior to the first occupation of the flats. | |||||||||||
14 |
Working hours: No work on Sundays/ bank holidays. |
|||||||||||
15 |
Impact pile driving working hours: Monday to Friday 0900-1700hours |
|||||||||||
16 |
No development beyond the construction of foundations shall take place until the applicant has submitted details of what measures will be implemented to design out |
KJA |
Design out crime | |||||||||
17 |
No development beyond the construction of foundations shall take place until full details |
Open Spaces/KJA |
£1275.00 + VAT | Hard and soft landscaping scheme. | ||||||||
18 | All hard and soft landscape works shall be carried out in accordance with the approved details. |
|||||||||||
19 | Any trees or shrubs that are removed, dying, being severely damaged or becoming seriously diseased within five years of planting shall be replaced. |
Trees or shrubs removed should be replaced. | ||||||||||
20 | Car parking space shall be kept available for such use at all times and no permanent development etc is allowed. | |||||||||||
21 |
The 4 EV charging points as shown on the drawing number 2666/10 rev Mode 3 standard (providing a minimum 7kw output) and SMART (enabling Wifi connection). |
|||||||||||
22 | The cycle parking facilities to accommodate a minimum of 24 cycle spaces (in accordance with the Transport Statement and drawings 2666/10 rev. C, BEXB-5000-1.001, Cycle Shelter Specification Sheet received on 27th September 2024), shall beinstalled prior to the first residential occupation. | |||||||||||
23 | The development shall be carried out in accordance with the Construction Management Plan (NRG Consulting, November 2023). | |||||||||||
24 | All dwellings shall be constructed to accord with part M4(2) of the Building Regulations. |